Water sampling at Da Mi reservoir
According Environmental and Social Management Plan (ESMP) approved by ADB, DHD Company needs to execute biodiversity assessment at Da Mi reservoir in quarterly basic since Da Mi Solar Power Plant has been put into operation. In order to evaluate impact of the Project to changes of aquatic habitat at locations of PVs arrays, ADB requests DHD to implement environmental assessment within the fourth quarter of 2019. As requirement from ADB, DHD will carry out surface water quality evaluation and take water samples for aquatic habitat analysis purpose at different depths of 10m, 20m and 20m at 04 different locations at Da Mi reservoir.
Water sampling at PVs arrays
In order to fulfill all requirements from ADB, DHD Company has worked with Bien Duc Environmental Analysis Scientific Technology JSC to implement sufficiently all contents of ESMP approved by ADB. The result of the fourth quarter Environmental Monitoring Report will be submitted by DHD to ADB and relevant authorities for contribution of monitoring.
Analysis of dissolved oxygen at sampling locations
Bien Duc Environmental Analysis Scientific Technology JSC is a member of League Group, a leading company in environmental, training and consult for acceptance of laboratories in Vietnam. Bien Duc JSC has more than 10 years’ experience operation in most of fields related to environmental protection, consultant, testing and inspection of laboratories.